a. |
The customer's premise is inaccessible or coordination with a third party for horizontal wiring and/or termination of socket is required.
|
| |
b. |
Power failure at the relevant building. |
| |
c. |
Additional time required for the approval issued by the building management office, building nominated contractor(s) and/or the customer. |
| |
d. |
Natural disaster. |
| |
e. |
Major cable fault that is out of HGC's control. |
| |
f. |
Weather constraints including severe thunderstorm, black rain or typhoon signal number 8 or above which may affect safety of staff in carrying out the restoration work. |
| |
g. |
Building which is not readily accessible, or is located in outlying island, restricted areas or hilltops. |
| |
h. |
The maintenance work to be performed by a third party who provides the in-building infrastructure. |